Smart Government Integration Platform A provincial government digital transformation benchmarking project

────────────────────────────────────────────────

industry Digital Government

customer type Provincial Government Agencies

project cycle 18 months

team size 35 people Copyright/IP Policy Project Case Study · Page 1

──────────────────────────────────────────────── CLIENT BACKGROUND 8500pt "> The customer is a provincial government department, under the jurisdiction of 20 + business offices, serving a population of more than 30 million. The original government system was built ten years ago, the technical architecture is outdated, the data between the business systems is not interoperable, the masses need to run errands many times, and the efficiency of the work is inefficient.

pain points and challenges 5000pt ">● 20 + business systems are independent, data islands are serious, cross-departmental collaboration is difficult ● 5000pt "> The masses need to submit duplicate materials to do things, on average, one thing runs more than 3 times ● 5000pt "> Insufficient concurrency of legacy systems, frequent crashes during peak periods ● 5000pt "> high safety compliance requirements, need to meet the third level of security standards Solutions 8500pt "> Build a" One Network Office "government service platform based on the microservices architecture. The front end adopts a unified portal + dual entrance on the mobile end, the data sharing and exchange center is built in the middle station, and the back end carries out gradual transformation and integration of various business systems. Introduce an AI intelligent pre-examination engine to realize automatic verification of materials and intelligent routing of processes.

program highlights 5000pt ">✦ microservices + containerized deployment, support elastic scaling, peak concurrent processing capacity increased by 10 times ✦ 5000pt "> The data sharing and exchange center opens up all business systems to achieve" more data and less errands for the masses " Intelligent ✦ AI pre-examination covers 85% of high-frequency matters, and automatically verifies the integrity of materials ✦ 5000pt "> full link localization adaptation to meet the requirements of Xinchuang

implementation process 5000pt "> Phase 1 (January-April): Requirement research and top-level design, complete 20 + departmental business combing Phase 2 (May-October): 5000pt "> data center construction + the first batch of 8 high-frequency matters launched Phase 3 (November-15): Remaining items are batched on-line + AI pre-clearance engine docking Phase IV (16-18 months): 5000pt "> Full Business Launch + Stress Testing + Safety Assessment + Formal Switching Achievements 5pt "> key results 5pt "> The online availability rate of▸ matters reaches 98%, and the average working time of the masses has been shortened from 3 days to 4 hours ▸ 5000pt "> Material submission is reduced by 60%, and 120 + class certificates are electronic. ▸ 5000pt "> Zero major failures after the system is launched, and the third-level evaluation of the warranty is passed once ▸ 5000pt "> was awarded the provincial digital transformation excellent case

Testimonials 0000pt ">" After the launch of the platform, the experience of the masses has been greatly improved, and the cross-departmental collaboration efficiency has been significantly improved. The project team is professional and efficient, has a very deep understanding of government scenarios, and the quality of delivery exceeds our expectations. ” —— Deputy Director of the Big Data Administration of a province Copyright/IP Policy

──────────────────────────────────────────────── Project Case Demonstration · Smart Government Integration Platform | Page 1 of 22